 国家一级建造师(一级项目经理)

 全国建设工程造价员(土建中级)

 Qualifications: National-level construction division (a project manager) Members of the national construction cost (construction Intermediate) 居

 住 地:

 江苏 扬州 Residence:

 Yangzhou Of Jiangsu Province 联 系 方 式:

 Tel:

 电 子 邮 件:

 E-mail:

  摘要 Abstract 在近八年的厂房建筑结构设计及项目现场管理工作中, 我主要致力于工业钢结构设计、 报价与安装;钢筋混凝土结构(工业厂房为主)

 结构设计与加固; 配合总经理进行投标报价, 参与项目合同的谈判;我在轻重型钢结构设计与安装及工业建筑现场项目管理领域都有丰富的经验。

 除了 日常的技术工作,我还负责项目投标书编制和技术人员管理。

 In the nearly eight years of factory building structural design and project site management work, I focused on industrial steel design, quotation and installation; reinforced concrete structures (industrial plant-based) structural design and reinforcement; with the general manager of a tender offer, involved in the project contract negotiations; I am light and heavy steel structure design and installation and industrial construction site project management has a wealth of experience. In addition to routine technical work, I was also responsible for the preparation of project proposals and technical staff.

 工作经验 Work Experience 任职时间:

 2002/08--至今 Work Journey:

 Since August 2002 公

  司:

 Company:

  职

 位; 现场技术员、 项目经理助理(2002/08-2004/12)

 Position:

 On-site technician and project manager assistant (2002/08-2004/12)

 工作职责:

 Responsibilities:

  根据甲方提供的工程招标图纸进行材料核算与投标报价, 提供合理的施工方案。

 According to Party works undertaken by the tender drawings and tender offer material accounting, to provide a reasonable construction programs.  项目实施时制定具体施工方案和项目执行过程中对安装进度计划并进行调整、 控制。

 Construction of the project implementation, to develop specific programs and project implementation process on the installation schedule and make adjustments to control it  在现场协调各方关系, 解决内外部产生的各种现场问题。

 On-site co-ordination between the parties to address the internal and external problems 工作业绩:

 Job Performance 中集(CMC)

 股份有限公司特种车辆车间新建工程 New construction workshop for the special vehicle of China International Marine Containers (CMC)

 Co. ,

 Ltd.

 项目描述:

 新建项目位于扬州市经济开发区区内, 建筑面积 21000 平方米, 檐口高度16 米 Project Description:

 New projects are located in Yangzhou Economic Development Zone area,

 building area of 21, 000 square meters,

 eaves height of 16 m . 江都诚德钢管有限公司连轧厂房 Jiangdu Chengde Steel Tube Co. ,

 Ltd. /Rolling Plant 项目描述:

 新建项目位于扬州市江都仙女镇内建筑面积 37000 平方米, 6 台 50 吨行车, 檐口高度 17 米

 Project Description: New projects are located in Yangzhou city of Jiangdu building area of 37, 000 square meters fairy town,

 6 sets of 50-ton vehicles,

 and eaves height of 17 meters 职

 位; 结构设计师(2004/12-2008/03)

 Position:

 Architect(2004/12-2008/03)

 工作职责:

 Responsibilitiies:

  负责各类工业结构(粮食加工, 油脂工程, 污水处理)结构施工图的绘制与统计各类材料

  及相关配件

 Responsible for various types of industrial structure (food processing,

 oil engineering,

 sewage treatment)

 during construction and statistical mapping of various types of materials and related accessories  根据甲方提供的工程招标资料进行投标报价, 提供合理的施工方案, 参与策划中标的方案。

 According to Party information provided by the project tendering bids to provide a reasonable implementation plan,

 participated in planning the successful program  负责对竞争对手进行策略分析, 向公司提出开发新工程创新建议 Responsible for strategic analysis of competitors to the companies to develop innovative proposals for new projects 工作业绩:

 Job Performance: 韩国希杰(南京)

 生物饲料有限公司新建厂工程

 South Korea"s CJ (Nanjing) Co., Ltd. The new plant bio-feed Engineering 项目描述:

 韩国希杰(南京)

 生物饲料有限公司新建项目位于南京市浦口区珠江镇工业园区南, 占地面积 120 亩。

 新建厂区总建筑面积 38898m2 Project Description:

 South Korea CJ (Nanjing)

 Biological Feed Co. ,

 Ltd. ,

 Nanjing New projects are located in the town of Pukou District,

 Pearl River Industrial Park South,

 covers an area of 120 acres.

 New factory with a total construction area of 38898m2 

  熟练使用 PKPM 结构设计软件, 完成 32m 高层钢结构车间及 36m 跨钢结构库房

  结构图的设计 Skilled use of PKPM structural design software to complete the 32m tall steel cross-steel structure workshop and warehouse 36mStructure Design 江苏迈安德机械有限公司重型厂房 Mai Ande Jiangsu Machinery Co. , Ltd/ Heavy Plant 项目描述:

 新建项目位于扬州市邯江工业园区, 建筑面积 9600 平方米, 2 台 50 吨行车, 檐口高度 17 米 Project Description:

 New projects are located in Yangzhou city Han Jiang Industrial Park,

 construction area of 9600 square meters,

 2 sets of 50-ton vehicles,

 and eaves height of 17 meters .

  

  针对本工程为重型钢结构, 对厂房采双层格构式刚性支撑方案, 单位面积用钢量节省 10%左右。

 For this project as a heavy-duty steel structure,

 mining plant and double-layer lattice rigid support programs,

 the amount per unit area of steel saves about 10% of the total

 职

 位:

 项目六部经理

 (2008/03-至今)

 Position:

 Project Manager of the Item 6 (since March 2008)

 工作职责:

 Responsibilities:

  主要负责大型钢结构和混凝土工程商务谈判, 负责与有实力大型设计院合作, 共同 为客户制定合理的设计方案。

 Mainly responsible for large-scale steel and concrete construction business negotiations,

 is responsible for a large design institute strong co-operation for the customer to develop a reasonable design.

  管理协调设计人员与现场安装队长配合, 按照合同要求、 计划进度、 质量目标和安全要求完成项目, 对合同执行中变更的确定和谈判等。

 对于特大型的工程项目, 聘请设计院的专家进行讨论研究。

 Manage and coordinate the designers and the captain with the officers and on-site installation,

 in accordance with contract requirements,

 on schedule,

 quality goals and safety requirements for completion of the project,

 to change the execution of the contract the identification and negotiations.

 For large projects,

 hire experts to discuss and study design institutes.

  工作业绩:

 Job Performance:

 中粮集团(江西)

 米业有限公司

 Cereals Industry Co. , Ltd of COFCO (Jiangxi)

 项目描述:

 本项目为混凝土框架结构加固工程, 总建筑面积 7735m2, 建筑层数 5 层, 建筑高度24m 。

 Project Description: The project is reinforced concrete frame construction,

 with a total construction area of 7735m2,

 building layers 5 layers,

 building height 24m.

  参与中粮集团高层的项目洽谈, 说服客户采用我公司建议的综合性价比较高的方案 Participate in COFCO senior project negotiations,

 to convince customers to adopt our company proposed a comprehensive program of cost-effective higher  对原有厂房进行检测鉴定, 负责主体结构加固图纸设计及外围加固图纸审核校对。

 Testing the original plant identification, the main structure responsible for the design and external reinforcement reinforcement drawings drawings audit proof. 淮安涟水机场航站楼管桁架吊装工程 Huaian Lianshui Airport Terminal tube truss hoisting 项目描述:

 淮安涟水机场是国家“十一五” 重点规划机场, 机场航站楼是淮安机场的核心建筑部分, 建筑面积 13828 平方米, 采用管桁架和箱型梁等组合成的空间复杂结构。

 Project Description: Huai" an Lianshui airport is national "Eleventh Five-Year" key on the airport,

 the airport terminal building is a core part of the airport Huai" an a building area of 13, 828 square meters,

 using tube truss and box-beam,

 etc.

 combined into the complex structure of space .

  为了保证钢结构安装精度, 在吊装过程中, 对桁架的整体变形进行了计算和监测。

 To ensure the accuracy of steel installed in the lifting process, the overall deformation of the truss is calculated and monitored.  与设计院进行配合, 对吊索与桁架的连接点进行强度验算与设计。

 Collaboration with the Design Institute on the sling connection points with the truss strength checking and design.

 技能 Skills  很强的专业技术功底(对国家建筑设计与施工方面的法规条文非常精通, 熟练操作CAD, PKPM 建筑结构设计软件, 及造价软件)

 。

 A strong technical foundation (for the National Building design and construction of the provisions in laws and regulations are very proficient, skilled operation of CAD, PKPM building structure design software, and the cost of software).

 

  优秀的与人沟通能力。

 能及时为客户、 公司领导解决问题或提供 解决方案 深刻理解本行业市场状态及流利的中英文表达能力 Excellent ability to communicate with others. In time for the customer, the company leadership to solve problems or provide solutions toDeep understanding of the industry"s market status and fluency in Chinese and English communication skills

 教育背景 Education: 1998/6-2002/6:

  土木工程专业(工民建方向)

 本科 Civil Engineering (civil engineering direction)

 bachelor degree

  培训经历 Training Experience 2004/05

  Jiangsu Construction Department

 建筑工程材料质量的控制 quality control of the Construction materials

 2005/06

 扬州市建设局

 Yangzhou City Construction Bureau 如何压缩项目成本空间提高施工企业效益

 How to compress project cost

 to improve efficiency of construction enterprises

 江苏建设厅

  2007/09

  Nanjing University of Technology

 工程项目投标的风险防范

  Project bidding risk prevention 2008/08

 同济大学项目管理高级研讨班

 Advanced Project Management Workshop of Tongji University BOT 项目运作程序探讨

  Operational procedures of BOT projects

 外语水平 Foreign language proficiency  英语听说读写熟练, 曾参与涉外工程, 大学英语 4 级 Skilled reading and writing in English, had been involved in foreign projects, and